Home
Drilling & Blasting
Water Supplies
Earth Protection
Renewable Energy
Site Investigation
Zyggis Team Racing
Contact Us
Links
Home
 

This has proved time after time to be the most cost effective and time efficient method of rock removal for civil engineering projects.

By far the cheaper option as opposed to Hydraulic Hammer.

Discovering rock on a job will not always result in a successful claim for unforeseen conditions. Drill and blast can put you back on schedule and avoid costly time penalties.

Our experience in the blasting industry has gained us a solid reputation for close proximity drilling and blasting.

We have used explosives to within 500mm of a listed building with no resultant damage to the structures or fittings.

We have authorisation to blast within 3 metres of fibre optic cables for utilities.

If you are looking for any of the services we offer, please feel free to contact us to provide you with a quote.

 
  .......Copyright 2005 Zyggis Rock Drilling. All Rights Reserved.